About This Project

 

PROJECT Shagaya Wind Farm

Country: Kuwait
Client: Elecnor
Typology: Wind farm
Power: 10 MW
Description: Wind farm with a capacity of 10 MW within the Shagaya complex (phases 1 and 2) with a useful life of 25 years. The project includes the engineering, construction and installation of 5 wind turbines of 2 MW each and connection to a 132 kilovolt substation.