About This Project

 

PROJECT Reynosa

Country: Reynosa, Mexico
Client: Acciona industrial México
Typology: : Wind farm
Power: 424 MW
Description: : Inspection of aerial thermography of electrical lines and substations of monthly character during a period of 24 months belonging to the Reynosa wind farm in Mexico. Zuma Energy granted the EPC modality of the park to Acciona industrial Mexico, was responsible for the foundations of 123 wind turbines, roads and their accesses. It installed the 34.5 kV medium voltage network, the 400 kV high voltage network with three substations ( two elevators and one interconnection) and 40 km of double circuit lines.